Easy carried out two Design & Build projects for ABB at the Sorocaba site, both designed by RP Studio. The first, between 2022 and 2023, created a technology center with a self-supporting structure inside the factory area. The second expanded the unit’s office, with night-time execution. Delivery was Turnkey.
The challenge: building inside a robotics factory
ABB is a multinational robotics and automation company. Building inside its factory area means following the rules of an operating industrial plant: documentation for every person and every stage, specific working hours and PPE suited to the environment.
The project was unusual. The technology center had to exist inside the factory, with space for events and conventions, without depending on the shed’s structure.
Technology center with a self-supporting structure in a factory area
The solution was a self-supporting structure: a volume that stands on its own, built in the middle of the factory area without relying on the existing building. Inside it, Easy built ABB’s technology center, with a robotics laboratory and areas for events and conventions.
The work was carried out during daytime hours, within the windows allowed by the plant, and delivered on time.
Second project: new office at the Sorocaba site
After the first delivery, ABB hired Easy again. This time, the scope was the expansion of the office area at the Sorocaba site, to receive a team that worked in São Paulo and was transferred to the unit. The design was also by RP Studio.
Even though it is outside the factory area, the office sits inside the industrial site. Documentation, logistics and working hours followed the plant’s rules, and the schedule was tight. To meet it, execution took place at night.
Schedule and method: Design & Build in both phases
On both projects, design and execution moved together. With the same architecture firm in both phases, Easy and RP Studio worked in an integrated way on projects with very different demands: the independent structure in the middle of the factory in the first, and the short schedule on a night shift in the second.
Result
Both projects were delivered on time and to the defined quality standard. ABB recorded its evaluation of the work in writing and on video, and the first delivery led directly to the second contract. See other projects in the Corporate segment.
Frequently asked questions
- Is it possible to build inside an operating factory?
- Yes. At ABB, Easy built a technology center inside the factory area following the plant’s rules: access documentation, set working hours and PPE specific to the industrial environment.
- What is a self-supporting structure and why was it used?
- It is a structure that stands on its own, without relying on the existing building. Inside the ABB factory, it made it possible to create the technology center as an independent volume in the middle of the factory floor.
- What was the contracting model?
- Design & Build, on both projects. The architectural design was by RP Studio, which worked with ABB on both phases. Delivery was Turnkey.
- Why was the second project carried out at night?
- The schedule was short and the office sits inside the industrial site, subject to the plant’s working-hours and logistics rules. Night-time execution was the way to meet the schedule within those rules.
- Was ABB satisfied with the projects?
- Yes. Both projects were delivered on time, and ABB recorded its evaluation of Easy’s work in writing and on video.