Gap
Gap
- Client
- Gap
- Location
- Terminal 3, Guarulhos Airport, SP
Easy built the Gap store at Terminal 3 of Guarulhos International Airport, with about 200 sqm, within the Dufry package of projects. The work took about 60 days, in 2014, following the brand’s standard, and the store was delivered for the terminal’s opening, shortly before the 2014 World Cup, with Turnkey delivery.
What was the scope of the Gap project?
Easy built the Gap store at Guarulhos Terminal 3, with about 200 sqm, following the brand’s pattern in finishes and ambience.
What was the main challenge?
The deadline for the opening of Terminal 3, which opened shortly before the 2014 World Cup. The store had to be ready for the opening, with the work on the airport’s airside and all the logistics and documentation required.
What was the contracting model?
Construction project with Turnkey delivery, within the Dufry stores package at the airport.
What was the result?
The store was delivered in about 60 days, in time for the airport’s opening, with a satisfied client.
Gap is part of the set of Easy projects for Dufry at Guarulhos, which includes the roughly 4,500 sqm store at Terminal 3, the Terminal 2 departures project and stores of brands such as Luxottica, Ferragamo and MAC.
See other projects in the Commercial segment.
Frequently asked questions
- Where is the store?
- At Terminal 3 of Guarulhos International Airport.
- What was the project area?
- About 200 sqm.
- When was the project done and how long did it take?
- About 60 days, in 2014, for the opening of Terminal 3, shortly before the World Cup.
- Did the store follow the brand's standard?
- Yes. The project followed Gap’s pattern in finishes and ambience.
- What was the contracting model?
- Construction project with Turnkey delivery, within the Dufry stores package at the airport.
Gap