Easy delivered a Turnkey corporate fit-out of approximately 1,200 sqm for Merck in São Paulo, designed by PITA Arquitetura. The work took place mainly at night and on weekends. It was Easy’s 17th project for the same client.
The challenge: producing within short windows
When work can only proceed outside business hours, usable time shrinks. Every night and every weekend has to count, because a lost window cannot be recovered the next day.
At Merck, this called for careful planning of work fronts, materials logistics and crew scheduling. The schedule was built around the available windows, with constant control so that each stage advanced without interfering with the building’s activities.
Corporate fit-out in São Paulo with exposed services
PITA Arquitetura’s design leaves in plain sight what is normally hidden. Exposed services and ducts, joinery and specific construction details are part of the language of the space.
With the infrastructure on display, execution becomes finish. The alignment of the ducts, the organization of the services and the junction with the joinery are visible to everyone who uses the office. This required integration between engineering and architecture throughout the work, with the design specifications as the reference for every decision.
What Easy delivered
The Turnkey execution covered the approximately 1,200 sqm of corporate spaces, bringing together the construction and finishing disciplines needed to transform the space according to the architectural proposal and Merck’s needs.
Schedule and method: 17 projects for the same client
A client who comes back for the 17th time changes the way a project begins. Easy already knows Merck’s standards, its internal processes and what is expected of a handover. With that history, planning starts from a known base.
Repeat business also works as an indicator. A company does not hire the same contractor seventeen times by chance.
Result
Easy delivered the approximately 1,200 sqm while meeting the demands of a highly detailed architectural design with a construction operation concentrated at night and on weekends.
The project adds one more delivery to a long-term partnership, in which each project builds on what was learned in the previous ones. See other projects in the Corporate segment.
Frequently asked questions
- How many projects has Easy delivered for Merck?
- This was Easy’s 17th project for Merck. The relationship was built across different projects, and each delivery adds knowledge about the client’s standards and processes.
- Why was the work carried out at night and on weekends?
- To reconcile the works with the operation of the corporate environment. Work fronts, materials logistics and crews were organized to use those windows without affecting the building’s activities.
- What was the contracting model?
- Turnkey. Easy was responsible for the complete execution of the approximately 1,200 sqm, from the construction disciplines to the finishes, through to handover of the finished spaces.
- Who designed the architecture?
- PITA Arquitetura. The design features exposed services and ducts, joinery and construction details that required constant integration between engineering and architecture throughout the work.
Merck