Vivest
Vivest
- Client
- Vivest
- Location
- Alameda Santos, 2477, São Paulo, SP
Easy fitted out Vivest, formerly Fundação CESP, on six floors (ground floor plus five), with 2,600 sqm, in the building at Alameda Santos, 2477, in São Paulo. The project was delivered as Design & Build with Dabus Arquitetura, Turnkey, in 2022, and took 120 days, in parallel with the building’s renovation. The design overcame the limitations of an older building with low ceilings through exposed infrastructure and designer light fixtures inspired by the brand’s logo.
Who is Vivest?
Vivest is the former Fundação CESP, a pension fund that also offers a health plan.
What was the scope of the Vivest project?
Vivest already occupied the building at Alameda Santos, 2477, and moved out so the building could be renovated. Easy fitted out the company on six floors, with 2,600 sqm: the ground floor and five more floors.
The project ran in parallel with the building’s renovation.
What was the main challenge?
The building is old and has low ceilings. The design needed a series of detailed solutions to be viable:
- some areas were left without a ceiling, to gain height;
- all the electrical infrastructure was left exposed and neatly aligned, creating a pattern for the areas without a ceiling;
- the light fixtures have a custom design, inspired by the Vivest logo.
What was the contracting model?
Easy won the Design & Build bid with Dabus Arquitetura, led by architect Heloísa Dabus, delivered Turnkey.
What was the result?
The six floors were delivered on schedule in 120 days, with a satisfied client. Vivest became a repeat client of Easy, with other projects after this one, and is a benchmark client for Easy in design, finishes and quality.
See other projects in the Corporate segment.
Frequently asked questions
- Where is Vivest's headquarters?
- At Alameda Santos, 2477, in São Paulo.
- How many floors did Easy build?
- Six, totaling 2,600 sqm: the ground floor and five more floors.
- How long did the project take?
- 120 days, in 2022, in parallel with the building’s renovation.
- How did the project handle the low ceiling height?
- Some areas were left without a ceiling, with all the electrical infrastructure exposed and aligned, and custom-designed light fixtures.
- Did Vivest hire Easy again?
- Yes. Vivest is a repeat client of Easy, with other projects after this one.